2026-11-21
| Item | Result |
|---|---|
| Project type | Low-voltage cable fault location, China |
| Cable length | 408 m, substation to community building |
| Installation | Duct, trench and direct burial; depth approx. 0.5 m |
| Fault | Phase C to ground, 15 kΩ insulation resistance |
| Site conditions | Beside an active railway with frequent trains |
A low-voltage cable serving a community building failed. The route is ducted, direct buried in places, and runs beside a railway. Phase C to ground measured 15 kΩ, a high-resistance single-phase earth fault, not a broken conductor. The job: locate it along 408 m and confirm one excavation point.
| Equipment | Model | Purpose |
|---|---|---|
| Cable fault pre-locator | XHGG502A | Pulse ranging, surge pre-location |
| Cable fault pinpointer | XHDD503E | Acoustic and electromagnetic pinpointing |
| Insulation tester | — | Fault classification |
| Integrated test unit | 510-12 | Support measurements |
| Burn-through bridge | XHSC-60Q | Rough location, burning |
With the cable isolated, phase-to-ground insulation was measured. Phase C returned 15 kΩ, too resistive to break down at low voltage.
Pulse ranging came first: non-destructive and fast. The trace matched the 408 m route.
![]()
Figure 1. Test site along the cable route.
Surge pre-location broke down the fault for a distance. Low-voltage flashover waveforms are often hard to read, so the bridge gave an independent check; where current fluctuated, output voltage was lowered.
![]()
Figure 2. Measurement during pulse ranging.
The section was checked with the pinpointer, using discharge sound and the sync signal. Low-voltage discharge is weak and trains added noise, so readings were repeated.
![]()
Figure 3. Measurement during surge pre-location.
![]()
Figure 4. Pinpointing in the direct-buried section.
Only recorded results are listed:
| Test | Method | Recorded result |
|---|---|---|
| Insulation | Insulation tester | 15 kΩ on phase C |
| Length | Pulse ranging (XHGG502A) | Matches the 408 m route |
| Rough distance | Bridge (XHSC-60Q) | Cross-check of surge result |
| Pre-location | Surge (XHGG502A) | Short section; waveform unclear |
| Pinpointing | Pinpointer (XHDD503E) | Discharge at one point |
The results confirmed a single-phase earth fault on phase C in the direct-buried section, where discharge was repeatedly detected. Insulation resistance fixed the fault type, pre-location and bridge results placed it within a short section, and pinpointing confirmed one spot.
The record does not cover excavation, repair or restoration, and does not establish whether other fault points exist. Bridge current behaviour is a caution, not proof of a second fault.
The case confirmed a high-resistance phase C earth fault on a 408 m cable, within one excavation area.
Each method covered the weakness of the one before: insulation testing set the fault type, pulse ranging the length reference, surge pre-location a distance hard to read alone, the bridge an independent rough location, pinpointing the physical confirmation.
| Method | Role in this case |
|---|---|
| Insulation testing | Fault type and resistance |
| Pulse ranging | Length reference |
| Surge pre-location | Distance on a high-resistance fault |
| Burn-through bridge | Independent rough location |
| Pinpointing | Physical confirmation |
It also sets equipment requirements: stable high-voltage output, readable low-current waveforms, an adjustable bridge, and a pinpointer that resolves a weak discharge in noise.
XZH TEST manufactures cable fault location and power testing instruments for distribution and industry. For a similar fault, send us the cable data and we will help plan the sequence: www.xzhtest.com
Work was carried out on a de-energised cable by qualified personnel. Surge testing requires isolation, discharge, earthing and separation from other circuits. A field record, not a substitute for the manual.
Q: Why can low-voltage surge waveforms be unreadable?
Flashover differs from medium-voltage cable, and test-setup reflections can dominate the trace. The bridge gives an independent distance.
Q: What does 15 kΩ insulation indicate?
A resistive path to ground; it will not break down at low voltage, so a high-voltage method is needed.
Q: What does a fluctuating bridge current mean?
Possibly several fault points. Lower the voltage to isolate one; locate the others separately.
Q: Why is pinpointing harder near a railway?
Trains generate continuous noise at discharge-detection frequencies, and the low-voltage signal is weak, so readings must be repeated.